Symptom
How to link the slice of the Pie Chart to Business Objects report
Reproducing the Issue
Product Version:-Xcelsius 2008 SP1 Fix Pack1.
Resolution
- Open Xcelsius and drag the Pie Chart component to canvas.
- Also drag the url link button on the canvas.
- Now wirte a opendoc url for the Business Objects report.
- Configure the Pie Chart to display the data.
- Enable drill down on the pie chart and specify an excel cell as the destination row.
- In the url button poreprties go to the behavior tab and specify the trigger cell.
- It should be the same location as the destination row specified in the drill down of Pie Chart.
Keywords
Pie Chart Xcelsius add linking , KBA , BI-RA-XL , Obsolete: BusinessObjects Dashboards and Presentation Design , Problem
Product
SAP BusinessObjects Xcelsius Enterprise 2008