Symptom
In the result list of the rescheduling run (trx V_V2, report SDV03V02) materials can be also seen that have not been included in the scope of selection for rescheduling.
Read more...
Environment
- SAP ERP Available-to-Promise
- SAP R/3
- SAP ERP Central Component
- SAP ERP
- SAP Enhancement package for SAP ERP
- SAP Enhancement package for SAP ERP, version for SAP HANA
- SAP S/4HANA
Product
SAP ERP 6.0 ; SAP S/4HANA 1610 ; SAP S/4HANA 1709 ; SAP S/4HANA 1809 ; SAP S/4HANA 1909 ; SAP S/4HANA 2020 ; SAP S/4HANA 2021 ; SAP S/4HANA 2022 ; SAP S/4HANA 2023 ; SAP S/4HANA 2025
Keywords
Neuterminierung, Ergebnisliste, Verkaufsbeleg, Kreditlimitsperre, Liefersperre, VBUK-CMGST, V_V2, SDV03V02, ATP, credit block, delivery block, header, item, material , KBA , SD-BF-AC-BOP , Backorder Processing, Rescheduling , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.