SAP Knowledge Base Article - Preview

1505768 - Different package status in status list and SM37 job log list - BPC 7.x NW

Symptom

  • When Lite Optimize is run in Business Planning and Consolidation (BPC) for NetWeaver (NW), the status list for Data Manager is inconsistent.
  • The Data Manager status shows that the job is running but the SM37 log shows that it has completed.
  • The Data Manager package cannot be terminates through Data Manager.
  • Error shows up in Data Package detail log:

===============================================================                                                           
An exception with the type CX_SY_DYN_CALL_PARAM_MISSING occurred, but                                                               
was neither handled locally, nor declared in a RAISING clause                                                                       
Call of the method IF_RSPC_GET_PARALLELIZATION~IS_SYNCHRONOUS of the                                                                
class CL_RSPLS_CUBE_SWITCH_L failed; the obligatory parameter I_VARIANT                                                             
has not been filled                   
===============================================================      


Read more...

Environment

  • SAP Business Planning and Consolidation 7.0, version for SAP NetWeaver
  • SAP BusinessObjects Planning and Consolidation 7.5, version for SAP NetWeaver

Product

SAP Business Planning and Consolidation 7.0, version for SAP NetWeaver ; SAP Business Planning and Consolidation 7.5, version for SAP NetWeaver

Keywords

CX_SY_DYN_CALL_PARAM_MISSING, IF_RSPC_GET_PARALLELIZATION~IS_SYNCHRONOUS, CL_RSPLS_CUBE_SWITCH_L failed , KBA , EPM-BPC-NW-DM , Data Manager , EPM-BPC-NW , NetWeaver Version , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.