Symptom
When scheduling to Ftp, the connection closes before the FTP server gives its answer around one second after the request. If the FTP answer comes with less than 1 second, everything goes well. This is a random behaviour.
The following error is included in the Job Server log:
Date Time|==| | |xxxx|xxxx| |||||||||||||||(.\destination_ftp.cpp:771) destination_ftp: exception caught during login to ftp server [server_name] (userName[user_name], userAcct[]). Details: [Failed to read reply from control connection: WSA10060].
Read more...
Environment
- Business Objects Enterprise XI 3.x
- Windows
Product
Keywords
FTP timeout, BOXI 3.1 SP1, BOXI 3.1 SP2, FixPack, BO Infoview, Webi, 1 sec, 2 sec , KBA , BI-BIP-PUB , Publishing and scheduling in InfoView/BI launch pad , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.