Symptom
When scheduling to Ftp, the connection closes before the FTP server gives its answer around one second after the request. If the FTP answer comes with less than 1 second, everything goes well. This is a random behaviour.
The following error is included in the Job Server log:
Date Time|==| | |xxxx|xxxx| |||||||||||||||(.\destination_ftp.cpp:771) destination_ftp: exception caught during login to ftp server [server_name] (userName[user_name], userAcct[]). Details: [Failed to read reply from control connection: WSA10060].
Read more...
Environment
- Business Objects Enterprise XI 3.x
- Windows
Product
Keywords
FTP timeout, BOXI 3.1 SP1, BOXI 3.1 SP2, FixPack, BO Infoview, Webi, 1 sec, 2 sec , KBA , BI-BIP-PUB , Publishing and scheduling in InfoView/BI launch pad , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview