SAP Knowledge Base Article - Preview

1595705 - PI Communication Channel parameters removed after transport

Symptom

  • After transporting a Process Integration (PI) or Process Orchestration (PO) Communication Channel the automatic activation of the Change List fails
  • Some of the configuration parameters, which are available in the source system, have not been transported to the target system
  • You expect all configuration parameters to be transported
  • The Transport Request (TR) may also fail with Return code 12 (RC=12)


Read more...

Environment

  • PI Release Independent
  • SAP NetWeaver
  • SAP Process Integration

Product

SAP NetWeaver all versions ; SAP Process Integration all versions

Keywords

Process Integration 7.0, PI 7.0, PI 7.01, PI 7.02, Process Integration 7.10, PI 7.10, Process Integration 7.11, PI 7.11, Process Integration 7.30, PI 7.30, Process Integration 7.31, PI 7.31, Process Orchestration 7.4, PI 7.4, PO 7.4, Process Orchestration 7.5, PI 7.5, PO 7.5, XI, AEX, JDBC, RFC, JMS, WS, SOAP, HTTP, Mail, CIDX, RNIF, BC, IDoc, Marketplace, CMS, CTS+, File System Transport, overwritten, export, cache, CPA, automatic, SFTP, Directory, RC12, Content Migration Tool , KBA , BC-XI-IBD , Integration Builder - Design , BC-XI-IBC , Integration Builder - Configuration , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.