Symptom
- You define, in the Product Master (transaction /SAPAPO/MAT1) in Lot-Size tab, that periodic lot-sizing procedure with Period Type 'K' - 'Planning Calendar' is to be used and you assign a Planning Calendar to the procedure. Despite this, when you plan using a Product Heuristic, orders are created with Availability Date during non-working days of the Planning Calendar.
- Alternatively, the same issue happens when you set flag "Use Lot Size Settings From Heuristic" and define in the heuristic settings a similar lot-sizing procedure (Period Lot-Sizing, Period Type = K, and a Planning Calendar).
- Alternatively, the same issue happens with Planning of Standard Lots in 3 Horizons (SAP_PP_004) heuristic when Procedure "Lot-Sizing Procedure From Product Master" is chosen.
Read more...
Environment
- SAP Supply Chain Management Production Planning and Detailed Scheduling (SCM-APO-PPS)
Product
Keywords
period, SAP_PP_002, SAP_PP_003, planning of standard lots, /SAPAPO/RRP_LOTSIZE_STD, ls_rrp_profile-sl_lsz_peri, FORM GET_AVAILABILITY_DATE, /SAPAPO/SAPLRRP_PLANNING, /SAPAPO/TIMESTAMP_GET_PERIOD, LS_RRP_PROFILE-TSTRID, LS_RRP_PROFILE-PERVR, Period Calendar (Without Gaps), Working Time Calendar (with Gaps), /SAPAPO/RRP_LOTSIZE_STD_CONTI, , KBA , calendar , period factor , periodic , periodic procedure , orders created in non-working days , order in non-working days , lot size , does not consider planning calendar , SCM-APO-PPS , Production Planning and Detailed Scheduling , SCM-APO-MD-PR , Product , SCM-APO-MD-CAL , Planning Calendar , SCM-APO-PPS-HEU-PP , PP Heuristics , Problem