Symptom
Scenario a) Connecting flow lines are not shown
- Connecting lines are missing from the APD in the displayed screen (transaction RSANWB).
- In transaction RSANWB, connecting flow-lines are missing from the APD display.
- APD links not connected to the nodes in the Analysis Process Designer.
- Objects are not aligned in APD display.
- Objects don't appear in straight line.
- Objects don't appear connected in RSANWB.
Scenario b) Cannot drag'n'drop node elements
- Drag'n'drop option is not available.
- Cannot select an element in RSANWB when creating an APD.
- Cannot use datasource, transformation or target element within an APD.
Scenario c) Cannot create or change an APD.
- Creating an APD in RSAWNB is not possible.
- APD name area is grayed out and uneditable during APD creation.
- Process types cannot be drag'n'dropped into the designing area.
- Existing APD cannot be edited.
Read more...
Environment
- SAP Netweaver - All Versions
Product
SAP NetWeaver all versions
Keywords
"Analysis Process Designer" "flow chart" "graphics" "flowline" "Grafikanzeige" "arrow" "display" "GUI" "connecting flow line" "connecting flow-line" "RSB4HCON" , KBA , BW-EI-APD , Analysis Process Designer , BC-FES-CTL , SAP GUI for Windows Controls , BW-EI-RTR , Retraction , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.