Symptom
Scenario a) Connecting flow lines are not shown
- Connecting lines are missing from the APD in the displayed screen (transaction RSANWB).
- In transaction RSANWB, connecting flow-lines are missing from the APD display.
- APD links not connected to the nodes in the Analysis Process Designer.
- Objects are not aligned in APD display.
- Objects don't appear in straight line.
- Objects don't appear connected in RSANWB.
Scenario b) Cannot drag'n'drop node elements
- Drag'n'drop option is not available.
- Cannot select an element in RSANWB when creating an APD.
- Cannot use datasource, transformation or target element within an APD.
Scenario c) Cannot create or change an APD.
- Creating an APD in RSAWNB is not possible.
- APD name area is grayed out and uneditable during APD creation.
- Process types cannot be drag'n'dropped into the designing area.
- Existing APD cannot be edited.
Read more...
Environment
- SAP Netweaver - All Versions
Product
SAP NetWeaver all versions
Keywords
"Analysis Process Designer" "flow chart" "graphics" "flowline" "Grafikanzeige" "arrow" "display" "GUI" "connecting flow line" "connecting flow-line" "RSB4HCON" , KBA , BW-EI-APD , Analysis Process Designer , BC-FES-CTL , SAP GUI for Windows Controls , BW-EI-RTR , Retraction , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview