SAP Knowledge Base Article - Preview

1768595 - MIRO/MIR7: WBS element in the Material tab and side effects

Symptom

  • In transaction MIRO/MIR7, it is necessary to have the field WBS element (technical name PSPNR) into the Material tab, and have this field saved in the subsequent FI document.
  • Error C+470 "Missing connection of material &1 in plant &2 to the material ledger" when booking an invoice against a material via MIRO/MIR7.

Image/data in this KBA is from SAP internal systems, sample data, or demo systems. Any resemblance to real data is purely coincidental.


Read more...

Environment

  • SAP ERP Central Component
  • SAP ERP
  • SAP enhancement package for SAP ERP
  • SAP enhancement package for SAP ERP, version for SAP HANA
  • SAP S/4HANA

Product

SAP ERP Central Component all versions ; SAP ERP all versions ; SAP R/3 Enterprise all versions ; SAP R/3 all versions ; SAP enhancement package for SAP ERP all versions ; SAP enhancement package for SAP ERP, version for SAP HANA all versions

Keywords

WBS element, PSPNR, MIRO, Material, OLMRLIST, RBMA, MR22, MIR7, missing connection, material ledger, Object, , valuated stock , KBA , MM-IV-LIV-CRE , Entry MIRO , CO-PC-ACT , Actual Costing , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.