Symptom
- In a 2 node SUP cluster, both nodes stopped. A restart of the SUP services was required.
- MlsrvWrapper.exe crash logs/dump named Report.ver showed the following:
Sig[8].Name=Problem Signature 09
Sig[8].Value=System.InvalidOperationException
DynamicSig[1].Name=OS Version
DynamicSig[1].Value=6.1.7601.2.1.0.272.7
DynamicSig[2].Name=Locale ID
DynamicSig[2].Value=1033
UI[2]=E:\Sybase\UnwiredPlatform\Servers\MessagingServer\Bin\MlsrvWrapper.exe
LoadedModule[23]=C:\Program Files\CA APM\Introscope 9.1.0.0\wily\bin\x86\wily.NativeProfiler.dll
- mlsrv_err.log showed:
I. 2013-05-12 06:56:53. <Main> Shutdown request from mlstop
I. 2013-05-12 06:56:53. <Main> MobiLink server shutting down
I. 2013-05-12 06:56:53. <Main> MobiLink server undergoing soft shutdown
I. 2013-05-12 06:56:53. <Main> No more new connections accepted.
Read more...
Environment
Sybase Unwired platform (SUP) 2.1.3.358
Product
Keywords
KBA , MOB-SUP-RT , SUP Runtime , Problem