Symptom
- In a 2 node SUP cluster, both nodes stopped. A restart of the SUP services was required.
- MlsrvWrapper.exe crash logs/dump named Report.ver showed the following:
Sig[8].Name=Problem Signature 09
Sig[8].Value=System.InvalidOperationException
DynamicSig[1].Name=OS Version
DynamicSig[1].Value=6.1.7601.2.1.0.272.7
DynamicSig[2].Name=Locale ID
DynamicSig[2].Value=1033
UI[2]=E:\Sybase\UnwiredPlatform\Servers\MessagingServer\Bin\MlsrvWrapper.exe
LoadedModule[23]=C:\Program Files\CA APM\Introscope 9.1.0.0\wily\bin\x86\wily.NativeProfiler.dll
- mlsrv_err.log showed:
I. 2013-05-12 06:56:53. <Main> Shutdown request from mlstop
I. 2013-05-12 06:56:53. <Main> MobiLink server shutting down
I. 2013-05-12 06:56:53. <Main> MobiLink server undergoing soft shutdown
I. 2013-05-12 06:56:53. <Main> No more new connections accepted.
Read more...
Environment
Sybase Unwired platform (SUP) 2.1.3.358
Product
Keywords
KBA , MOB-SUP-RT , SUP Runtime , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview