SAP Knowledge Base Article - Preview

1898330 - Sybase Unwired Platform 2.1.3, scheduled MBO refresh did not run - SUP/SMP

Symptom

User running Sybase Unwired Platform 2.1.3.2.  Normally, MBO scheduled cache refresh job runs at 0300 in the morning, but one night the scheduled refresh did not run correctly.  No errors in the Sybase Unwired platform log.

  1. SYBASE\UnwiredPlatform\Servers\UnwiredServer\Repository\Instance\com\sybase\djc\scheduler\ScheduledTask\refreshjob.properties file shows the job executed with the correct time stamp.
  2. Inside Sybase Control Center,  Monitoring => Cache Statistics => Package level cache group => Last Update Time statistic for the time does not show it ran.


Read more...

Environment

  • Sybase Unwired Platform 2.1.3.2
  • MBO
  • Scheduled Cache Refresh

Product

Sybase Unwired Platform 2.1

Keywords

  • MBO
  • refresh
  • scheduled task
, KBA , MOB-SUP-DCN , Sybase Data Change Notification , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.