Symptom
- MobiLink Server's have stopped unexpectedly several times.
- This problem only exists on this server, there are no problems on the second server.
- After changing the loglevel, get one unexpected shutdown, on server 2.
server.log :
2013-07-30 04:24:20.270 INFO Mobilink Thread-6081 [com.sybase.ml.sup.Logger] [] [] Shutdown request from mlstop
2013-07-30 04:24:20.270 INFO Mobilink Thread-6082 [com.sybase.ml.sup.Logger] [] [] MobiLink server shutting down
2013-07-30 04:24:20.271 INFO Mobilink Thread-6083 [com.sybase.ml.sup.Logger] [] [] MobiLink server undergoing soft shutdown
2013-07-30 04:24:20.271 INFO Mobilink Thread-6084 [com.sybase.ml.sup.Logger] [] [] No more new connections
accepted. Completing existing synchronizations
...
mlsrv_err.log :
E. 2013-07-29 17:19:22. <2265> [-10117] Stream Error: Error parsing HTTP header: ml-get-bytes
I. 2013-07-30 05:24:20. <Main> Shutdown request from mlstop
I. 2013-07-30 05:24:20. <Main> MobiLink server shutting down
I. 2013-07-30 05:24:20. <Main> MobiLink server undergoing soft shutdown
I. 2013-07-30 05:24:20. <Main> No more new connections accepted. Completing existing synchronizations
E. 2013-07-30 05:24:56. <Main> [-10124] The following non-daemon threads were destroyed: Thread-13, 1354466740@qtp-1429667080-0,
...
Read more...
Environment
- SMP 2.3 SP01 Simple Load Balancing Cluster Installation
( simple means, there is one data tier and two mobile server nodes )
Product
Keywords
MobiLink, Server, mlstop, shut down , KBA , MOB-SUP-RT , SUP Runtime , MOB-SUP , Sybase Unwired Platform , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview