SAP Knowledge Base Article - Preview

1934830 - How to enable both Pre-generation and Post-generation Transformations - SAP PD 16.5

Symptom

How to enable both Pre-generation and Post-generation Transformations when generating a PDM from a LDM?

In a LDM (Logical Data Model),  I create an Extension (XEM). In the XEM, I create two transformations:

  • Transformation 1 is for Pre-generation
  • Transformation 2 is for Post-generation

When I run "Generate Physical Data Model", I select the 'Enable Transformation' option. I expect to see options to select both the pre and post generation Transformations. However, only the Pre-generation tab is available. How do I enable the Post-generation transformation?


Read more...

Environment

  • SAP PowerDesigner (PD) 16.5

Product

SAP PowerDesigner 16.5

Keywords

"physical data model", "Updating existing physical data model" , KBA , BC-SYB-PD , PowerDesigner , How To

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.