SAP Knowledge Base Article - Preview

1951226 - Sybase Unwired Platform - SUP Upgrade 2.1 to 2.2 fails at Messaging Server migration

Symptom

On customer production system the upgrade fails at the very end of the whole setup routine when the messagging server is upgraded.

This is the errormessage displayed:

14-11-2013 06-38-31.jpg

According to the logs, where is an OutOfMemoryExepction when the
DBUpgrader.exe tries to convert/sync the QUEUED_MESSSAGES database OBR table at D:\Sybase\UnwiredPlatform\Servers\MessagingServer\Data\OBR.
The QUEUED_MESSAGES.adm is 17GB large and the QUEUED_MESSAGES.add is 1.2GB large.

After using the packtool customer was able to reduce the size from 17GB to 2.7GB. But still the upgrade fails with the same error. It
looks like 2.7GB is still to large.


Read more...

Environment

Upgrade from SUP 2.1.x to 2.2 (Sybase Unwired Platform)

Product

Sybase Unwired Platform 2.2

Keywords

KBA , MOB-SUP-RT , SUP Runtime , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.