2027986 - The way of requirement date calculated in T-code ME2ON. SAP ERP

Symptom

It is not quite clear about how the system calculates the Requirement date (MEREP_OUTTAB_SUBCON-EBDAT) on T-code ME2ON.


Read more...

Environment

  • Materials Management (MM)
  • SAP enhancement package 4 for SAP ERP 6.0
  • SAP enhancement package 4 for SAP ERP 6.0 on SAP enhancement package for SAP NetWeaver 7.0
  • SAP enhancement package 5 for SAP ERP 6.0
  • SAP enhancement package 6 for SAP ERP 6.0
  • SAP enhancement package 7 for SAP ERP 6.0
  • SAP enhancement package 6 for SAP ERP 6.0, version for SAP HANA

Product

SAP enhancement package 4 for SAP ERP 6.0 ; SAP enhancement package 4 for SAP ERP 6.0 on SAP enhancement package for SAP NetWeaver 7.0 ; SAP enhancement package 5 for SAP ERP 6.0 ; SAP enhancement package 6 for SAP ERP 6.0 ; SAP enhancement package 6 for SAP ERP 6.0, version for SAP HANA ; SAP enhancement package 7 for SAP ERP 6.0

Keywords

ECC, subcontracting, calculation, dates, pdt, me2on, me20n, requirement, BOM, cs03, OPPQ , KBA , purchasing processing time , planned delivery time , MM-PUR-GF-SC , Subcontracting , How To

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.