Symptom
- Upgrade and migration of the system fails using SUM with the DMO option
- The upgrade stops with the error Severe error(s) occurred in phase MAIN_SHDINST/SUBMOD_SHDALIASCRE/EU_CLONE_CRE_SHDVIEWS!
Last error code set: 1 processes failed, check 'R3LDCALLPRP.*' for details.
- The log file R3LDCALLPRP.xxx contains the error similar to:
EXECUTING C:\usr\sap\<SID<\SUM\abap\exe\R3ldctl.EXE -T -p C:\usr\sap\<SID>\SUM\abap\shdviews -i C:\usr\sap\<SID>\SUM\abap\shdviews\SHDVIEWS_PRP00001_IN.LST -o C:\usr\sap\<SID>\SUM\abap\shdviews\SHDVIEWS_PRP00001_EXP.STR
ERROR: Select for is_valid_view failed
(null)
ERROR: Select for is_valid_cds_view failed
Invalid object name 'DDDBSTMTHD'.
ERROR: /BEV1/TSDD03VT_V is not a valid view
SAPup> Process with PID 28392 terminated with status 2 at 20140804154654!
Read more...
Product
SAP NetWeaver 7.4
Keywords
UPG , KBA , BC-UPG-TLS-TLA , Upgrade tools for ABAP , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.