Symptom
DIA or BGD workprocess remains in Status "On Hold" with Reason "RFC" in transaction SM50, or Status "Stopped" with Reason "CPIC" in transaction SM66.
Before Basis release 740
As of Basis release 740
Read more...
Environment
All versions of SAP NETWEAVER
Product
SAP NetWeaver 2004 ; SAP NetWeaver 7.0 ; SAP NetWeaver 7.1 ; SAP NetWeaver 7.2 ; SAP NetWeaver 7.3 ; SAP NetWeaver 7.4 ; SAP NetWeaver 7.5 ; SAP enhancement package 1 for SAP NetWeaver 7.0 ; SAP enhancement package 1 for SAP NetWeaver 7.3 ; SAP enhancement package 2 for SAP NetWeaver 7.0 ; SAP enhancement package 3 for SAP NetWeaver 7.0
Keywords
Stopped, On Hold, Stopped/CPIC, On Hold/RFC, performance, hanging, RFC Response, response, SM51, Performance , KBA , BC-MID-RFC , RFC , BC-CST-GW , Gateway/CPIC , How To
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.