Symptom
- Within Process Integration (PI), using the B2B Add-On, you face the following error:
"Message processing failed. Cause: com.sap.aii.converter.x12.xml2x12.XML2X12Exception: XML-Parser error occured while parsing: Cannot process close tag S_GS: The length of the parameter "name" is <number_of_characters> characters, but the allowed maximum is 30 characters (value = "<value>")"
Read more...
Environment
- SAP enhancement package 1 for SAP NetWeaver Process Integration 7.1
- SAP NetWeaver 7.3
- SAP enhancement package 1 for SAP NetWeaver 7.3
- SAP NetWeaver 7.4
- SAP NetWeaver 7.5
- SAP Process Integration, connectivity add-on
- SAP Process Integration, business-to-business add-on
- SAP Process Integration, secure connectivity add-on
Product
SAP NetWeaver 7.3 ; SAP NetWeaver 7.4 ; SAP NetWeaver 7.5 ; SAP NetWeaver Process Integration, business-to-business add-on 1.0 ; SAP NetWeaver Process Integration, connectivity add-on 1.0 ; SAP NetWeaver Process Integration, secure connectivity add-on 1.0 ; SAP enhancement package 1 for SAP NetWeaver 7.3 ; SAP enhancement package 1 for SAP NetWeaver Process Integration 7.1
Keywords
Process Integration 7.11, PI 7.11, Process Integration 7.30, PI 7.30, Process Integration 7.31, PI 7.31, Process Orchestration 7.40, PI 7.40, PO 7.40, Process Orchestration 7.50, PI 7.50, PO 7.50, NetWeaver, XI, AEX https://me.sap.com/notes/2010227 , KBA , BC-XI-CON-B2B , B2B add-on (business-to-business) , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.