SAP Knowledge Base Article - Preview

2203786 - Upgrading ASE 157 from SP110 to SP135 failed.

Symptom

  • ASE dataserver process consistently dies after reaching:
    Network and device connection limit is 3057.
    ASE - Dynamic Pluggable Component Interface is disabled in the errorlog.

  • Customer has tried starting the ASE using the SP 135 binaries with both the existing configuration, and an empty configuration. The result is the same. The failed dataserver process leaves behind an orphaned shared memory segment that has to be cleared up using ipcrm.

 


Read more...

Environment

SAP Adaptive Server Enterprise (ASE) 15.7

Product

SAP Adaptive Server Enterprise 15.7

Keywords

upgrade solaris sun , KBA , BC-SYB-ASE , Sybase ASE Database Platform (non Business Suite) , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.