2212241 - Total Panned Cost is Showing as Zero in Project WIP Report

Symptom

Planned cost in the Project WIP Report is supposed to reflect estimated cost for a given material based on the responsbile unit of the project.

All of the materials used have shown missing planned cost in this report inspite of current estiamted cost maintained in the Material Valuation view.