SAP Knowledge Base Article - Preview

2228491 - The Integrated Planning message's necessary information for Design Studio

Symptom

  • You run into an Integrated Planning issue in Design Studio and would like to create a message under component BW-PLA-IP.
  • Often the first reply in a message is always requesting the same data or actions.


Read more...

Environment

  • SAP BW/4HANA
  • SAP BusinessObjects Design Studio 1.4 
  • SAP BusinessObjects Design Studio 1.5
  • SAP BusinessObjects Design Studio 1.6
  • SAP NetWeaver SAP NetWeaver 7.0
  • SAP NetWeaver 7.3
  • SAP NetWeaver 7.4
  • SAP NetWeaver 7.5
  • SAP enhancement package 1 for SAP NetWeaver 7.0
  • SAP enhancement package 1 for SAP NetWeaver 7.3
  • SAP enhancement package 2 for SAP NetWeaver 7.0
  • SAP enhancement package 3 for SAP NetWeaver 7.0

Product

SAP BW/4HANA 1.0 ; SAP BusinessObjects Design Studio 1.4 ; SAP BusinessObjects Design Studio 1.5 ; SAP BusinessObjects Design Studio 1.6 ; SAP NetWeaver 7.0 ; SAP NetWeaver 7.3 ; SAP NetWeaver 7.4 ; SAP NetWeaver 7.5 ; SAP enhancement package 1 for SAP NetWeaver 7.0 ; SAP enhancement package 1 for SAP NetWeaver 7.3 ; SAP enhancement package 2 for SAP NetWeaver 7.0 ; SAP enhancement package 3 for SAP NetWeaver 7.0

Keywords

required information, Planning, Design Studio, prerequisites, check list , KBA , BW-PLA-IP , Integrated Planning , BI-RA-AD , Design Studio End Of Maint Note 2622437 , EPM-BPC-BW4-PLA , BPC/4 - Planning Enginee , How To

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.