Symptom
1. A logon to the oracle database with sqlplus fails with ORA-12560: TNS:protocol adapter error
2. In the DBA Planning Calendar (DB13) scheduled jobs (backup, statistic creation, etc.) are failing with the following error:
BR0301W SQL error -12560 at location BrDbConnect-2, SQL statement:
'CONNECT /'
ORA-12560: TNS:protocol adapter error
Read more...
Environment
Windows 2008 R2
Oracle 11g
SAP Netweaver 7.0 and higher
Product
Keywords
TNS-12518, TNS-12560, TNS-00530, nt main err code: 530, nt secondary err code: 258, The wait operation timed out, sqlplus, CONNECT / , KBA , BC-DB-ORA , Oracle , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview