SAP Knowledge Base Article - Preview

2250288 - Poor performance of BPC data manager packages

Symptom

In BPC NW, a user may find the performance of most data manager package executions deteriorating dramatically over time. For example, executing a package usually takes 20 seconds. After several months if a user executes the same package again, it takes almost 10 minutes.

After running an ST05 trace of the package execution, an SQL trace is always retrieving data from table "RSR_CACHE_FFB".

For example:

ST05 Trace.JPG


Read more...

Environment

  • SAP Business Planning and Consolidation, version for SAP NetWeaver

Product

SAP Business Planning and Consolidation 10.0, version for SAP NetWeaver ; SAP Business Planning and Consolidation 10.1, version for SAP NetWeaver

Keywords

RSR_CACHE_ADMI, performance slow, bad performance,  !1, !O or !A, RSRCACHE, EPM BPC NW, SAP business planning and consolidation for netweaver, ST05, RSR_CACHE_FFB, BW, infinite loop, hangs, hanging, stuck, long time , KBA , EPM-BPC-NW , NetWeaver Version , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.