SAP Knowledge Base Article - Preview

2307723 - Loading Durations are per Freight Unit in a Freight Document in SAP TM.

Symptom

  • Freight Documents (Freight Order or Freight Booking) that contains more than one Freight Unit (FU) is created in SAP Transportation Management (TM).
  • The two FUs have identical Source Location and departure times.
  • Each FU have non-zero Loading Durations, specified either throuth the FU or Means of Transport (MTr) or Planning Profile. 
  • The loading per FU is handled sequentially and not in parallel. For example, if FU1 takes one hour and FU2 takes one hour for loading, then the Transportation Unit will spend two hours at the source destination for loading.


Read more...

Environment

  • SAP Transportation Management 9.1
  • SAP Transportation Management 9.2
  • SAP Transportation Management 9.3

Product

SAP Transportation Management 9.1 ; SAP Transportation Management 9.2 ; SAP Transportation Management 9.3 ; SAP Transportation Management 9.4

Keywords

FWO, FRM, VSR, optimizer, PLN. , KBA , TM-PLN-VSR-OPT , Optimizer , How To

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.