Symptom
- CKMLCP includes 'old' SITs every month, thus hugely increasing the processing time of CKMLCP.
- The number of cost estimates increase every month in CKMLCP because of SiT deliveries and project systems related movements.
Read more...
Environment
- Controlling (CO)
- Financial Accounting (FI)
- SAP R/3 Enterprise 4.7
- SAP ERP Central Component
- SAP ERP
- SAP enhancement package for SAP ERP
- SAP enhancement package for SAP ERP, version for SAP HANA
Product
SAP ERP 6.0 ; SAP ERP Central Component 5.0 ; SAP ERP Central Component 6.0 ; SAP R/3 Enterprise 4.7x110 (Extension Set 1.10) ; SAP R/3 Enterprise 4.7x200 (Extension Set 2.00) ; SAP enhancement package 1 for SAP ERP 6.0 ; SAP enhancement package 2 for SAP ERP 6.0 ; SAP enhancement package 3 for SAP ERP 6.0 ; SAP enhancement package 4 for SAP ERP 6.0 ; SAP enhancement package 4 for SAP ERP 6.0 on SAP enhancement package for SAP NetWeaver 7.0 ; SAP enhancement package 5 for SAP ERP 6.0 ; SAP enhancement package 6 for SAP ERP 6.0 ; SAP enhancement package 6 for SAP ERP 6.0, version for SAP HANA ; SAP enhancement package 7 for SAP ERP 6.0 ; SAP enhancement package 8 for SAP ERP 6.0 ; SAP enhancement package for SAP ERP 2005 ; mySAP ERP 2004
Keywords
CKMLCP, single-level price determination, CKMH, multi-level price determination, revaluation of single-level consumption, WIP calculation, closing entry, CKMI, PARA-ACTIVE, PARA-NEW_MODE, performance, throughput, user experience, usability runtime volume high low response time selection TSV_TNEW_PAGE_ALLOC_FAILED package size optimizing CKMLMVADMIN CKMLPP status too many materials slow iteration CO-PC-ACT Actual Costing Material Ledger ML error , KBA , CO-PC-ACT , Actual Costing , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.