Symptom
The requirements are not grouped according to the lot size of the material master in the planning segments make-to-order production, engineer-to-order (project), or planning without final assembly. Here is an example, displaying requirements on the same date in segment make-to-order production.
Lot size in material master is daily (TB) or lot by lot (EX) or weekly (WB) or monthly (MB). The material has a daily lot size TB in the material master as below, so MRP must create one planned order with quantity 24 (= 4 X 6 ) only because all of the 6 'OrdReq' (Order reservations) have the same date. However, it creates 3 planned orders.
Image/data in this KBA is from SAP internal systems, sample data, or demo systems. Any resemblance to real data is purely coincidental.
Read more...
Environment
- Production Planning (PP)
- SAP R/3
- SAP R/3 Enterprise
- SAP ERP Central Component
- SAP ERP
- SAP enhancement package for SAP ERP
- SAP enhancement package for SAP ERP, version for SAP HANA
Product
Keywords
MRP list, stock/requirement list, material requirements planning, MM02, MM03. , KBA , PP-MRP-PE , Planning Evaluation , How To