SAP Knowledge Base Article - Preview

2349286 - Project does not reconnect from Database Output adapter to the database - SAP ESP

Symptom

  • The SAP Event Stream Processor (ESP) project is using the Database Output Adapter.

  • The adapter for the project successfully connects to a database and inserts rows.

  • However, when there is a communication failure between the ESP node and the destination database, the adapter does not automatically reconnect, causing data loss. 

  • An alert mechanism is required.

  • A manual restart of the ESP project or of the adapter is required to reestablish the connection from the adapter to the database.

  • The ESP Adapters Guide documentation for the Database Output Adapter does not specify any properties for reconnection capability.


Read more...

Environment

SAP Event Stream Processor 5.1 SP11.

Product

SAP Event Stream Processor 5.1

Keywords

esp, output adapter, adaptor , KBA , BC-SYB-ESP , Sybase ESP (Event Stream Processor) , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.