SAP Knowledge Base Article - Preview

2352774 - Error in phase EU_CLONE_CRE_SHDVIEWS using DMO option of SUM

Symptom

The upgrade with DMO option stops with the error in phase MAIN_SHDINST/SUBMOD_SHDALIASCRE/EU_CLONE_CRE_SHDVIEWS!

The log file R3LDCALLPRP.ELG contains the following errors:

(RTF) ########## WARNING ###########

Without ORDER BY PRIMARY KEY the exported data may be unusable for some databases

(RDI) ERROR: /usr/sap/<SID>/SUM/abap/shdviews/SHDVIEWS_PRP0000X_IMP.STR: unsupported format version <X>, minimum required version is 1, maximum allowed is 5

/usr/sap/<SID>/SUM/abap/exe/R3load: job finished with 1 error(s)

(STAT) DATABASE times: 0.020/0.000/0.000 100.0%/0.0%/0.0% real/usr/sys.

/usr/sap/<SID>/SUM/abap/exe/R3load: END OF LOG: <Time stamp>


Read more...

Environment

SAP systems based on Netweaver ABAP

Product

SAP NetWeaver all versions

Keywords

MAIN_SHDINST, SUBMOD_SHDALIASCRE, R3ldctl, absorb, job completed, HANA, migration, unsupported, SUM 2.0, minimum , KBA , BC-UPG-TLS-TLA , Upgrade tools for ABAP , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.