SAP Knowledge Base Article - Preview

2364341 - OBJ period end closing performance optimization at a glance

Symptom

The runtime of the period end closing reports in cost object controlling is very long. Jobs are running long for WIP / Results Analysis, Variance Calculation, Settlement.


Read more...

Environment

  • Controlling (CO)
  • SAP R/3
  • SAP R/3 Enterprise 4.7
  • SAP ERP Central Component
  • SAP ERP
  • SAP enhancement package for SAP ERP
  • SAP enhancement package for SAP ERP, version for SAP HANA
  • SAP S/4HANA Finance
  • SAP S/4HANA

Product

SAP ERP Central Component all versions ; SAP ERP all versions ; SAP R/3 Enterprise all versions ; SAP R/3 all versions ; SAP S/4HANA Finance all versions ; SAP S/4HANA all versions ; SAP enhancement package for SAP ERP all versions ; SAP enhancement package for SAP ERP, version for SAP HANA all versions

Keywords

KBA, cost object controlling, CO, CO-PC, CO-PC-OBJ, period end closing, too long, runtime, performance, SM37, KKAX, KKAO, KKS1, KKS2, RKKKS1N0, KO88, CO88, RKO7CO88, RKO7VA88, KKAS, KKS5, KKS6, MFN1, CON2, RKAZCON2, increased, rapidly, fast, slow, parallel processing, deletion flag, detail list, line items, schedule manager, SCMO, SCMA, SAPKKA00, SAPKKA00BG, SAPKKA07, RKAZCO43, CO43, RKAZKGI4, RKAZVA44, WIP, results analysis, variance calculation, settlement, overhead calculation, PEC, month end closing, RSDBTIME , KBA , CO-PC-OBJ , Cost Object Controlling , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.