SAP Knowledge Base Article - Preview

2394070 - Cancel multiple EOIO messages in holding status

Symptom

  • You have several EOIO asynchronous messages stuck in Holding status.
  • You want to cancel all these messages


Read more...

Environment

  • SAP enhancement package 1 for SAP NetWeaver 7.3
  • SAP NetWeaver 7.4
  • SAP NetWeaver 7.5

Product

SAP NetWeaver 7.4 ; SAP NetWeaver 7.5 ; SAP enhancement package 1 for SAP NetWeaver 7.3

Keywords

Process Integration 7.31, PI 7.31, Process Orchestration 7.4, PI 7.4, PO 7.4, Process Orchestration 7.5, PI 7.5, PO 7.5, XI, AEX, pimon, pi monitor, pi monitoring, rwb, runtime work bench, runtime workbench, cancel, canceling, cancelling, multiple, several, hold, holding, EOIO, asynchronous, database monitor, database overview, message overview, message monitor, first message, stuck, struck, PI, Process Integration, mass cancellation, mass cancel , KBA , BC-XI-CON-MSG , Messaging System , BC-NWA-XPI , Process Integration (PI) Monitoring , BC-XI-IS-WKB , Runtime Workbench / Monitoring , How To

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.