SAP Knowledge Base Article - Preview

2408581 - EOIO cluster lock for JMS communication channel

Symptom

  • In a Process Integration (PI) or Process Orchestration (PO) system you have multiple Java Server Nodes (Cluster Nodes)
  • You have configured JMS Adapter scenarios which use the Quality of Service Exactly Once In Order (EOIO)
  • In the Communication Channel Monitor, you notice that clusters which are not in use for the specific JMS EOIO channel report an error

    2016-12-23_11-09-59.png
  • In the Node Details you can see warning such as "EOIO cluster lock: com.sap.aii.adapter.jms.eoio has already been acquired for the EOIO channel by another cluster node..." (note: this is the expected warning message for a node which does not have the EOIO cluster lock)

    2016-12-23_11-11-25.png
  • This can result in unwanted/unnecessary alerts being generated for this situation


Read more...

Environment

  • PI Release Independent
  • SAP NetWeaver
  • SAP Process Integration

Product

SAP NetWeaver all versions ; SAP Process Integration all versions

Keywords

Process Integration 7.0, PI 7.0, PI 7.01, PI 7.02, Process Integration 7.10, PI 7.10, Process Integration 7.11, PI 7.11, Process Integration 7.30, PI 7.30, Process Integration 7.31, PI 7.31, Process Orchestration 7.40, PI 7.40, PO 7.40, Process Orchestration 7.50, PI 7.50, PO 7.50, NetWeaver, XI, EOIO, JSM, channel, node error, node warning, cluster node error, cluster alerts
, KBA , BC-XI-CON-JMS , JMS Adapter , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.