SAP Knowledge Base Article - Preview

2415890 - Importing ESR design objects throws warning in PI

Symptom

  • You are using Process Intergation (PI) or Process Orchestration (PO) as middleware to integrate, for example, SAP Hybris Cloud for Customer with SAP ERP or connecting your ERP System to PI/PO for Elster implementation
  • As part of the integration, you import XI_SAP_BASIS.tpz package downloaded from the SAP Service Marketplace into the Enterprise Service Repository (ESR)
  • The import is successful but the following warning message is present:
    "Post import consistency check found XX consistency issues (see details)"
    2415890.png


Read more...

Environment

  • SAP enhancement package 1 for SAP NetWeaver Process Integration 7.1
  • SAP NetWeaver 7.3
  • SAP enhancement package 1 for SAP NetWeaver 7.3
  • SAP NetWeaver 7.4
  • SAP NetWeaver 7.5

Product

SAP NetWeaver 7.3 ; SAP NetWeaver 7.4 ; SAP NetWeaver 7.5 ; SAP enhancement package 1 for SAP NetWeaver 7.3 ; SAP enhancement package 1 for SAP NetWeaver Process Integration 7.1

Keywords

Process Integration 7.11, PI 7.11, Process Integration 7.30, PI 7.30, Process Integration 7.31, PI 7.31, Process Orchestration 7.4, PI 7.4, PO 7.4, Process Orchestration 7.5, PI 7.5, PO 7.5, XI, ProComp Interaction Model, Sales Order Processing, ESM, References Inactive Object, Connection:null , KBA , BC-XI-IBF , Framework , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.