2447274 - Lot-Size settings are ignored in MTO and Project segments

Symptom

  • You execute the Product Heuristic for a Location-Product which has Make-to-Order or Individual Project Segments

    • You notice the lot size settings defined at the Product Master were not respected by the heuristic. Examples

      • A Maximum Lot-Size was specified in /SAPAPO/MAT1, but the heuristic creates receipts with quantities higher than this value
      • A fixed or periodic lot-size was specified, but the heuristic covers all requirements with Lot-for-Lot procedure

  • Alternatively, you transfer a Material from ECC to APO and expect that flag Lot Size Always will be set at the Product Master, in Lot Size tab, but the flag remains unchecked


Read more...

Environment

  • SAP Supply Chain Management Production Planning and Detailed Scheduling (SCM-APO-PPS)

Product

SAP ERP, add-on for embedded production planning and detailed scheduling all versions ; SAP Supply Chain Management all versions ; SAP enhancement package for SAP Supply Chain Management all versions

Keywords

LGKND, /SAPAPO/LGKND, lot-size always, es_lot_profile-sl_lsz_exact, sl_lsz_exact, sl_lsz_peri, SAP_PP_002, BSTMA, /SAPAPO/BSTMA , KBA , SCM-APO-PPS-HEU-PP , PP Heuristics , SCM-APO-MD-PR , Product , SCM-APO-INT-MD-PR , Product , Problem