SAP Knowledge Base Article - Preview

2460008 - Transition "CPFROMDT" failed for scenario "CPFROMEHP" during phase RUN_CRR_LAST in SUM with nZDM

Symptom

During a system upgrade task using SUM with nZDM option, RUN_CRR_LAST phase fails due to error:

Phase MAIN_NEWBAS/RUN_RSCPFROM_CRR were negative!

Last error code set: Single errors (code <= 8) found in logfile 'RSCPFROMDT.ELG' (Logfile: DIR_PUT\abap\RSCPFROMDT.ELG)

ERROR:
Batchjob RSCPFROM_CRR failed.
Detected the following errors:

# SUM\abap\log\RSCPFROM_CRR_DT.<SID>:
A4 ESCRR 171 WP: "Nr## , ReportSAPLSDEB, Client000, UserDDIC, Status""On Hold"" "" "
A4 ESCRR 171 WP: "Nr## , Report, Client, User, StatusWaiting"" "" "" "
A4 ESCRR 171 WP: "Nr@@, Report, Client, User, StatusWaiting"" "" "" "
A4 ESCRR 171 WP: "Nr%%, Report, Client, User, StatusWaiting"" "" "" "
A4 ESCRR 089 "8" background jobs configuered, "8" available
A2EESCRR 056 Transition "CPFROMDT" failed for scenario "CPFROMEHP"
A2EESCRR 082 JOB_CLOSE failed with RC "8" and release status " "

 


Read more...

Environment

OS : Windows

SUM using Near Zero Downtime option (nZDM)

Product

SAP NetWeaver 2004 ; SAP NetWeaver 7.0 ; SAP NetWeaver 7.1 ; SAP NetWeaver 7.2 ; SAP NetWeaver 7.3 ; SAP NetWeaver 7.4 ; SAP NetWeaver 7.5 ; SAP enhancement package 1 for SAP NetWeaver 7.0 ; SAP enhancement package 1 for SAP NetWeaver 7.3 ; SAP enhancement package 2 for SAP NetWeaver 7.0 ; SAP enhancement package 3 for SAP NetWeaver 7.0

Keywords

SUM, nZDM, near Zero Downtime, RSCPFROMDT.ELG, Batchjob RSCPFROM_CRR failed, MAIN_NEWBAS/RUN_RSCPFROM_CRR, CRR, SAPLOCALHOST, Hostname buffer, profile. , KBA , BC-UPG-TLS-TLA , Upgrade tools for ABAP , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.