Symptom

  • Heuristic SAP_PP_021 is executed in a Planning Run (/SAPAPO/CDPSB0) and the Explosion Date is modified with BAdI /SAPAPO/RRP_EXPLODE, Method REEXPLODE_CHANGE_EXPL_DATE

  • The new Explosion Date is months into the future

  • At the end of the Planning Run, the planned orders are not reexploded and the message below is raised:
    • Message no. /SAPAPO/DM_SCHEDFAIL005 - Validity of activity ||| lies outside planning period

Image/data in this KBA is from SAP internal systems, sample data, or demo systems. Any resemblance to real data is purely coincidental.


Read more...

Environment

  • SAP enhancement package for SAP Supply Chain Management
  • SAP Supply Chain Management
  • SAP ERP, add-on for embedded production planning and detailed scheduling 
  • SAP S/4HANA 1610 and higher

Product

SAP ERP, add-on for embedded production planning and detailed scheduling all versions ; SAP S/4HANA 1610 ; SAP S/4HANA 1709 ; SAP S/4HANA 1809 ; SAP S/4HANA 1909 ; SAP S/4HANA 2020 ; SAP S/4HANA 2021 ; SAP S/4HANA 2022 ; SAP S/4HANA 2023 ; SAP S/4HANA 2025 ; SAP Supply Chain Management all versions ; SAP enhancement package for SAP Supply Chain Management all versions

Keywords

/SAPAPO/DM_SCHEDFAIL005, /SAPAPO/DM_SCHEDFAIL 005, /SAPAPO/DM_SCHEDFAIL_005, "Validity of activity", "lies outside planning period", ET_SCHED_FAILURES[1]-TYPE 21 , KBA , SCM-APO-PPS-HEU-PP , PP Heuristics , SCM-APO-PPS-SCF , Scheduling Functions , Problem