SAP Knowledge Base Article - Preview

2486759 - Time Windows to Control Pick-Up/Delivery of Freight Units in SAP Transportation Management

Symptom

  • SAP Transportation Management with Manual or VSR Optimizer Planning of Freight Units (FUs) from Order-based Transportation Requirements (OTRs), Delivery-based Transportation Requirements (DTRs), or Forwarding Orders (FWOs) results in undesired Pick-up/Delivery (PUDL) times.
     
    or
     
    ERP Sales Order Scheduling using SAP Transportation Management results in undesired Delivery date.
     
  • For Optimizer Planning, the Explanation logs (transaction RCCF_LOG) display for the Result > Freight Units > Messages for Stages possible entries:

        You have not entered a requested end date; lateness not penalized (/SCMTMS/PLN_OPT_EXP601)

        You have not entered a requested start date; earliness not penalized (/SCMTMS/PLN_OPT_EXP600)

  • Resulting Freight Document may have delivery time set to the end of the Planning Horizon or the pick-up time set to the beginning of the Planning Horizon. 


Read more...

Environment

  • SAP Transportation Management 9.x
  • SAP Transportation Managemen embedded in SAP S/4HANA 1709 and above releases

Product

SAP S/4HANA 1709 ; SAP S/4HANA 1809 ; SAP S/4HANA 1909 ; SAP S/4HANA 2020 ; SAP S/4HANA 2021 ; SAP S/4HANA 2022 ; SAP S/4HANA 2023 ; SAP Transportation Management all versions

Keywords

PU, DLV, PUDL, PU/DLV, FUBR, FU, FO, FB, TC, VSR, SOS, MP, Manual Planning, Automatic Planning, Optimizer Planning, VSR Planning, Hard Constraint, Soft Contraint, Conditions, /SCMTMS/TOR_TIMEWIND, /SCMTMS/CL_TOR_STOP_PUDL DETERMINE_PUDL_WINDOW, APPLY_PUDL_RULE_TO_STOP_COND, APPLY_ROUNDING_TO_ACC, execution block, time conflict, hard and soft constraint, delivery window, time window. /SCMTMS/TOR613, /SCMTMS/TOR 614, 613, 614, /SCMTMS/TOR , KBA , TM-PLN-FU , Freight Unit , TM-FRM-TIM , Time Management , TM-PLN-MP , Manual Planning , TM-PLN-VSR , Vehicle Scheduling and Routing (VSR) , TM-INT-LI-CS-OS , Order Scheduling , TM-PLN-SCH , Scheduling , How To

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.