SAP Knowledge Base Article - Preview

2491257 - CK11N: quantity structure not considered

Symptom

  • During the creation of a plan cost estimate in transaction CK11N the system does NOT select the quantity structure entered on the selection screen, e.g the production version, bill of material (BOM) and/or routing.
  • The production version, BOM and/or routing entered on the selection screen is ignored.


Read more...

Environment

  • Controlling (CO)
  • SAP ERP Central Component
  • SAP ERP
  • SAP enhancement package for SAP ERP
  • SAP enhancement package for SAP ERP, version for SAP HANA
  • SAP S/4HANA Finance
  • SAP S/4HANA

Product

SAP ERP 6.0 ; SAP ERP Central Component 5.0 ; SAP ERP Central Component 6.0 ; SAP S/4HANA Finance all versions ; SAP enhancement package 6 for SAP ERP 6.0 ; SAP enhancement package 6 for SAP ERP 6.0, version for SAP HANA ; SAP enhancement package 7 for SAP ERP 6.0 ; SAP enhancement package 8 for SAP ERP 6.0

Keywords

KBA CK11N CK40N quantity structure production version BOM bill of material routing wrong not considered not determined overriden not correct incorrect removed ignored selection screen Fertigungsversion Mengengerüst nicht übernommen ignoriert falsch berücksichtigt überschrieben , KBA , CO-PC-PCP , Product Cost Planning , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.