SAP Knowledge Base Article - Preview

2511563 - In phase PREP_INIT/DB2_CHECKNOTES_INI Error: The update procedure with target release 740 needs a patched version of the tool listed below

Symptom

In phase PREP_INIT/DB2_CHECKNOTES_INI the SUM returns the following error (or similar):

PREPARE MODULE Initialization
Showing only entries of type error...
=========== Action PREP_INIT/TOOLCHECKXML_UPG, Type error: List of tools failing the checks ===========
*ERROR:*
*Symptom:*
The update procedure with target release 740 needs a patched version of the
tool listed below.
Each tool in question was called from the target release kernel in
'/usr/sap/<SID>/SUM/abap/exe'.
*Necessary Action*

*For the Target Release Kernel:*
Download the new non-unicode tools (DB independent resp. DB dependent for
ORACLE) according to *SAP Note 2337629* and put the archives into the download
directory /SAPCDS/UPG_740.

List of failing tools:
Kernel Type:|exe |/usr/sap/<SID>/SUM/abap/exe


Read more...

Keywords

Upgrade Update SUM BR*Tools , KBA , BC-UPG-TLS-TLA , Upgrade tools for ABAP , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.