SAP Knowledge Base Article - Preview

2515625 - shelf life: receipt not consumed by demand and projected wastage appears

Symptom

In SNP shelf life scenario. There are demands, e.g. forecast demand, and a receipt, e.g. purchase requisition. Expectation is that the demand should consume the receipt and that should not be an projected wastage at the end of shelf life of the receipt. However the receipt is not consumed and there is a projected wastage.


Read more...

Environment

  • SAP Supply Chain Management
    • Advanced Planner and Optimizer
      • Supply Network Planning (SNP)
        • Interactive Planning with consideration of Shelf Life

Product

SAP Supply Chain Management 2005 ; SAP Supply Chain Management 2007 ; SAP Supply Chain Management 4.0 ; SAP Supply Chain Management 4.1 ; SAP Supply Chain Management 7.0 ; SAP enhancement package 1 for SAP Supply Chain Management 7.0 ; SAP enhancement package 2 for SAP Supply Chain Management 7.0 ; SAP enhancement package 3 for SAP Supply Chain Management 7.0 ; SAP enhancement package 4 for SAP Supply Chain Management 7.0

Keywords

Receipt, maximum, Shelf Life, Stock on hand(Shelf Life), Supply Shortage(Shelf Life), pegging. , KBA , SCM-APO-SNP-INS , Interactive SNP , SCM-APO-SNP-BF , Basic Functions , How To

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.