Symptom
If your system landscape is modified, you can recreate the task list structure of a cycle using this system landscape, based on these changes.
There are two use cases:
-
A change control landscape is changed in the solution landscape (transaction SLAN) and in the landscape management database (transaction LMDB). For example, a logical component group was added or a system was removed from a logical component group.
-
You want to add or remove systems to / from transport tracks at TMS level
This option is available for:
- the systems with target role in system landscape
- the systems with source and production role under the two scenarios specified in SAP Note 2587310 - Remove Development and Production systems during redefine landscape
Open the cycle and click in More -> Redefine Landscape, follow the indications in the guided procedure.
Read more...
Environment
SAP Solution Manager 7.2
Product
Keywords
redefining, land, scape, changing prd system, track, how to, add, charm, change, close , KBA , SV-SMG-CM , Change Request Management , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.