Symptom
During system upgrade with SUM+DMO, it fails in Phase MAIN_NEWBAS/TABIM_UPG with below error:
Last error code set:
Calling '/usr/sap/SID/DVEBMGSXX/exe/tp' failed with return code 234, check
/usr/sap/SID/SUM/abap/log/SAPup.ECO for details
SAPUp.ECO log:
------------------------------------------------------
TRACE-INFO: 472: [ dev trc,00000] ? , ? , ? , ? );
TRACE-INFO: 473: [dbsdbsql.cpp,00000] *** ERROR => prepare() of C_0019, rc=1, rcSQL=313
TRACE-INFO: 474: [dbslsdb.cpp ,00000] *** ERROR => PREPARE C_0019 on connection 0, rc=313
TRACE-INFO: 475: [ dev trc,00000] SQLCODE : 313
TRACE-INFO: 476: [ dev trc,00000] SQLERRTEXT : invalid sequence: DDLOG_SEQ: line 1 col 83 (at pos 82)
TRACE-INFO: 477: [ dev trc,00000] sc_p=1116cb4f8,no=19,idc_p=111730b28,con=0,act=0,slen=120,smax=256,#vars=4,stmt=111a4fc10,table=DDLOG
TRACE-INFO: 478: [ dev trc,00000] stmtid = <1//bas/749_REL/src/krn/dbi/dbs/dbsynseq /566/20170804145240>
TRACE-INFO: 479: [ dev trc,00000] INSERT INTO DDLOG ( SEQNUMBER, TIMESTAMP, SYSTEMID, NBLENGTH, NOTEBOOK) VALUES ( DDLOG_SEQ.NEXTVAL,\
TRACE-INFO: 480: [ dev trc,00000] ? , ? , ? , ? );
TRACE-INFO: 481: [ dbsynseq,00000] ***LOG BZY=>unexpected return code 103 calling INS
TRACE-INFO: 482: [ dbsync ,00000] ***LOG BZY=>unexpected return code 2 calling ins_ddlog
HALT 20170917022708
tp returncode summary:
TOOLS: Highest return code of single steps was: 16
ERRORS: Highest tp internal error was: 0234
tp finished with return code: 234
meaning:
uncaught error -> function err_exit called
SAPup> Process with PID 17892318 terminated with status 234 at 20170917022713!
Read more...
Environment
SAP Netweaver
Product
Keywords
invalid sequence, DDLOG_SEQ, TABIM_UPG, return code: 234, SQLCODE : 313 , KBA , BC-UPG-TLS-TLA , Upgrade tools for ABAP , HAN-DB-ENG , SAP HANA DB Engines , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.