SAP Knowledge Base Article - Preview

2544729 - How to schedule GRAC_DELETE_REPORT_SPOOL to run daily

Symptom

The program GRAC_DELETE_REPORT_SPOOL needs to be scheduled as a daily background job. One of the program parameters is a Date field, which should automatically reflect the current date at the time of each execution. How can this be configured so that the Date field is dynamically updated with the current date during each run?

Image/data in this KBA is from SAP internal systems, sample data, or demo systems. Any resemblance to real data is purely coincidental.


Read more...

Environment

  • GRC Access Control 10.0
  • GRC Access Control 10.1
  • GRC Access Control 12.x

Product

SAP Access Control 10.0 ; SAP Access Control 10.1 ; SAP Access Control 12.0 ; SAP Access Control 12.0 for SAP S/4HANA

Keywords

Delete Report Spool Data, SM36, SM37, Dynamic Date Calculation , KBA , GRC-SAC-ARA , Access Risk Analysis , How To

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.