SAP Knowledge Base Article - Preview

2556726 - Upgrade of PI/PO from 7.4 to 7.5 - Integration Builder object transports

Symptom

  • You are planning the upgrade of a Process Integration (PI) or Process Orchestration (PO) Java Only from release 7.4 to release 7.5
  • You plan to have the Development (DEV) and/or Quality Assurance (QA) systems at release 7.5 for a period of time for testing
  • During this period the PRD system will be on release 7.4
  • You would like to know if there are any restrictions for transporting emergency changes to PRD i.e. transport PI Enterprise Services Repository (ESR) and/or Integration Builder Directory objects from 7.5 release to 7.4 release


Read more...

Environment

  • SAP NetWeaver 7.3
  • SAP enhancement package 1 for SAP NetWeaver 7.3
  • SAP NetWeaver 7.4
  • SAP NetWeaver 7.5

Product

SAP NetWeaver 7.0 ; SAP NetWeaver 7.3 ; SAP NetWeaver 7.4 ; SAP NetWeaver 7.5 ; SAP NetWeaver Process Integration 7.1 ; SAP NetWeaver Process Integration, business-to-business add-on 1.0 ; SAP NetWeaver Process Integration, connectivity add-on 1.0 ; SAP NetWeaver Process Integration, secure connectivity add-on 1.0 ; SAP enhancement package 1 for SAP NetWeaver 7.0 ; SAP enhancement package 1 for SAP NetWeaver 7.3 ; SAP enhancement package 1 for SAP NetWeaver Process Integration 7.1 ; SAP enhancement package 2 for SAP NetWeaver 7.0 ; SAP enhancement package 3 for SAP NetWeaver 7.0

Keywords

Process Integration 7.30, PI 7.30, Process Integration 7.31, PI 7.31, Process Orchestration 7.4, PI 7.4, PO 7.4, Process Orchestration 7.5, PI 7.5, PO 7.5, XI, AEX, SLD , KBA , BC-XI-IBF , Framework , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.