Symptom
When creating new bill of material (BOM), an existing bill of material with a different BOM usage can be used as a source to copy from. In the new BOM some of the following indicators of item status were wrongly copied:
- Engineering/ design (Item relevant to engineering)
- Production relevant (Item relevant to production)
- Plant maintenance (Item relevant to plant maintenance)
- Spare part indicator (Spare part)
- Relevant to sales (Item relevant to sales)
- CostingRelevncy (Relevancy to Costing)
Read more...
Environment
- SAP ERP Logistics (LO)
- SAP R/3
- SAP R/3 Enterprise
- SAP ERP Central Component
- SAP ERP
- SAP Enhancement package for SAP ERP
- SAP Enhancement package for SAP ERP, version for SAP HANA
- SAP S/4HANA, on-premise
- SAP S/4HANA Cloud Private Edition
Product
Keywords
LO-MD-BOM, CS01, CS02, CS03, Copy From, Vorlage kopieren, Bill of material, Materialstückliste, Usage, Verwendung, Item, Position, RC29P-SANKO, RC29P-SANFE, RC29P-SANIN, RC29P-ERSKZ, RC29P-RVREL, RC29P-SANKA, Konstruktionsrel., Fertigungsrelevanz, Instandhaltungsrel., Ersatzteil-Kennz., Vertriebsrelevanz, KalkRelevanz , KBA , LO-MD-BOM , Bills of Material , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview