Symptom
When creating new bill of material (BOM), an existing bill of material with a different BOM usage can be used as a source to copy from. In the new BOM some of the following indicators of item status were wrongly copied:
- Engineering/ design (Item relevant to engineering)
- Production relevant (Item relevant to production)
- Plant maintenance (Item relevant to plant maintenance)
- Spare part indicator (Spare part)
- Relevant to sales (Item relevant to sales)
- CostingRelevncy (Relevancy to Costing)
Read more...
Environment
- SAP ERP Logistics (LO)
- SAP R/3
- SAP R/3 Enterprise
- SAP ERP Central Component
- SAP ERP
- SAP Enhancement package for SAP ERP
- SAP Enhancement package for SAP ERP, version for SAP HANA
- SAP S/4HANA, on-premise
- SAP S/4HANA, cloud edition
Product
Keywords
LO-MD-BOM, CS01, CS02, CS03, Copy From, Vorlage kopieren, Bill of material, Materialstückliste, Usage, Verwendung, Item, Position, RC29P-SANKO, RC29P-SANFE, RC29P-SANIN, RC29P-ERSKZ, RC29P-RVREL, RC29P-SANKA, Konstruktionsrel., Fertigungsrelevanz, Instandhaltungsrel., Ersatzteil-Kennz., Vertriebsrelevanz, KalkRelevanz , KBA , LO-MD-BOM , Bills of Material , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.