SAP Knowledge Base Article - Public

2567527 - Old version of integration job is running after a new version has been scheduled - Integration Center

Symptom

While monitoring Integration Center jobs, you noticed that a job is being executed multiple times across different versions, including the current and older ones.

Environment

  • SAP SuccessFactors HCM Suite
    • Integration Center

Reproducing the Issue

Usually the issue can be reproduced through the following steps:

  1. Create multiple versions of an integration (e.g., change it and save it four times), then schedule the latest version.
  2. Go to Audit History, open an earlier version (e.g., version 2), modify and save it to create a new version, and schedule it.
  3. Observe that multiple versions (e.g., versions 4 and 5) are scheduled, resulting in jobs for each version in Provisioning.

Cause

The IC schedule engine may not have been worked correctly.

Resolution

  1. Access the affected IC job;
  2. Navigate to the Scheduling tab;
  3. Set the the Scheduled Version Occurs field to Suspended/Not Scheduled;
  4. Save;
  5. Then repeat the steps above setting the schedule as you want.

If all steps have been carried out and the unwanted version is still running, the IC job will need to be cancelled in the Provisioning (backend), so you need to request that to your partner or raise a support ticket to LOD-SF-INT-INC-JOB.

Note: this issue should have been fixed by an internal code correction in 2H 2025. If the issue is still occurring after that, it probably started before the fix was deployed.

See Also

KBA 2430723 - Changes not Applied to Scheduled Integrations in Integration Center

Keywords

schedule, scheduling, versions, multiple, version, outdated, suspended , KBA , LOD-SF-INT-INC-JOB , Integration Center Job , Problem

Product

SAP SuccessFactors HCM Suite all versions