Symptom
You are testing PI Communication Channel using "Ping Channel" button in Communication Channel Monitor.
Result shows "Communication failed" (red light) for some server nodes, and successful result (green light) for other server nodes.
While you have already checked in your cluster, and believe that all the server nodes should return same result. (e.g., target host/port is reachable from OS of all application server, firewall is not blocking any particular instance, etc)
Read more...
Environment
- SAP NetWeaver Process Integration 7.1
- SAP enhancement package 1 for SAP NetWeaver Process Integration 7.1
- SAP NetWeaver 7.3
- SAP enhancement package 1 for SAP NetWeaver 7.3
- SAP NetWeaver 7.4
- SAP NetWeaver 7.5
Product
Keywords
Ping Channel, communication failed, communication channel, cluster system, nwa, Process Integration 7.10, PI 7.10, Process Integration 7.11, PI 7.11, Process Integration 7.30, PI 7.30, Process Integration 7.31, PI 7.31, Process Orchestration 7.4, PI 7.4, PO 7.4, Process Orchestration 7.5, PI 7.5, PO 7.5, XI, AEX , KBA , BC-XI-CON-AFW , J2EE Adapter Framework , BC-NWA-XPI , Process Integration (PI) Monitoring , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.