SAP Knowledge Base Article - Public

2573673 - How to stop a scheduled interface in Integration Center

Symptom

The purpose of this KBA is to show how to correctly Stop a Scheduled Integration in Integration Center.

Environment

  • Integration Center
  • Successfactor

Resolution

To clear the schedule, please follow below steps:

    1. Access the Effected Integration Center Integration
    2. Navigate to the Scheduling page
    3. Clear the set schedule
    4. Click on the "Set Schedule" Button
    5. Save the integration center report
    6. After Clearing the Schedule you can now delete the Integration if required.

Please Note that the scheduling of Integration Center reports can only be set/edited/removed inside the Integration Center scheduling Page, and NOT in provisioning, any modification to the schedule in provisioning will result in the Integration failing.

Keywords

Integration Center, Scheduled Integration, Remove Schedule, successfactors, success, factors, erase, clear, update, change, modify, outdated, , KBA , LOD-SF-INT-INC , Integration Center , LOD-SF-INT , Integrations , How To

Product

SAP SuccessFactors HCM Suite all versions