Symptom
During upgrade process, the following error occurs during SUM phase CPK_INCLUSION:
- Error in remote connection to destination SAPOSS
SPDA_CPKINCLUSION.LOG
---------------------------------
[...]
2EESB331 Error in remote connection to destination "SAPOSS": "Error when opening an RFC connection (LB: Hostname""or service of the message
[...]
---------------------------------
CPKINCLUSION.LOG
-------------------------
4EETQ399 CPK inclusion failed, rc = "12", reason = "Error in remote connection to destination SAPOSS: Error when opening an RFC con".
1EETQ399 Last error code set is: Error during CPK inclusion. Return Code = 12, Reason =
1EETQ399X"Error in remote connection to destination SAPOSS: Error when opening an RFC con", check log file-------------------------
1EETQ399X'SPDA_CPKINCLUSION.LOG' for details
1EETQ204 Upgrade phase "CPK_INCLUSION" aborted with severe errors ("20171210214337")
Read more...
Environment
ABAP based System
Product
SAP NetWeaver all versions
Keywords
PREP_EXTENSION/CPK_INCLUSION, SPDA_CPKINCLUSION, SPDA_CPKINCLUSION.LOG, CPKINCLUSION, CPKINCLUSION.LOG, SAP Note data incomplete, RFC connection , KBA , BC-UPG-TLS-TLA , Upgrade tools for ABAP , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.