SAP Knowledge Base Article - Preview

2594539 - Surplus is Created After Running the Product Heuristic with Safety Stock Method SM

Symptom

  • After running the Product Heuristic with Safety Stock Method SM, a surplus is generated by the Net Requirement Calculation even though sufficient receipt quantity already exists.


Read more...

Environment

  • SAP Supply Chain Management Production Planning and Detailed Scheduling (SCM-APO-PPS)

Product

SAP S/4HANA all versions ; SAP Supply Chain Management all versions

Keywords

Safety Stock Method, Safety Days' Supply, Procurement Planning Heuristic, Surplus, SM, Maximum of SB and SZ from the location product master, Safety Stock, Safety Stock, Net Requirement Calculation, Heuristic , KBA , SCM-APO-PPS , Production Planning and Detailed Scheduling , SCM-APO-PPS-HEU , Heuristics , SCM-APO-PPS-HEU-PP , PP Heuristics , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.