Symptom


You are allowed a grace period of 90 days when the requisite number of licenses is not met since SAP IQ 16.0 SP11 PL07 and later. 
SAP IQ Server issues warnings when the requisite number of licenses are not available and provides the expiration duration time, up to the maximum of 90 days. Previously, the maximum was 30 days.
This behavior has changed with SySAM 2.4 that uses with SAP IQ 16.0 SP11 PL07 and later.

But, there is not a description about the expand of a grace period for a license check out in the documents.


Read more...

Environment

  • SAP IQ 16.1
  • SAP IQ 16.0 SP11 PL07 and later
  • SAP Replication Server SP 305 and later
  • SAP Adaptive Server Enterprise 15.7 SP 135 and later

Product

SAP Adaptive Server Enterprise 15.7 ; SAP Adaptive Server Enterprise 16.0 ; SAP IQ 16.0 ; SAP IQ 16.1 ; SAP Replication Server 15.7 ; SAP Replication Server 16.0

Keywords

CR813827, CR#813827, 813827 , SP11PL07 period expire expired , KBA , BC-SYB-IQ , Sybase IQ , Bug Filed

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.