Symptom
The following operator messages can occur in Redwood and spools/joblogs are not transfered to the Redwood server:
"Size of job log is <size> which exceeds the limit of 1048576. Job log is skipped"
or
"Size of spool 23381 of step 1 is 26176018 which exceeds the limit of 1048576. Spool is skipped"
It is possible to view the job log or spool via T-code "SM37" directly in the SAP system, however the spool or joblog is not available in CPS/BPA UI.
which exceeds the limit of 1048576. Job log is skipped" - BPA Operator Message"> Read more...
Environment
- SAP Central Process Scheduling by Redwood
- SAP Business Process Automation by Redwood
Product
Keywords
SAP_MaxSpoolSize, SAP_MaxLogSize, Size of spool , which exceeds the limit, Spool is skipped, CPS, BPA, SAP, Redwood, joblog, job, log , KBA , XX-PART-REDWOOD-BPA , SAP Business Process Automation by Redwood , XX-PART-REDWOOD-CPS , SAP Central Process Scheduling by Redwood , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview